Home
About
Us
Our
Services
Shop
Work
Engine
Builds
Whats
New
On-line
Catalog
Close-outs
and Used Items
Vendor
Lines
Contact
Us
PROJECT FALCON
CUTTING OF THE UPPER FRAME RAILS TO FIT THE BLOWER
LEFT FRAME TUBE RE-WORK
LEFT 2
FRONT CROSS MEMBER RE-MADE
RACK MOUNT MODIFICATION
RACK MOUNT FABRICATION
MAKING NEW TRANS AND INNER COOLER MOUNTING BRACKETS
RADIATOR SUPPORT FABRICATION
INNER COOLER MOUNTS FABRICATED
NEW ENGINE MOUNT FABRICATION
ENGINE MOUNT FABRICATION
BOTH UPPER FRAME RAILS AFTER BEING CUT THEY HAD TO BE REFORMED AND RE-WELDED.
WHAT IT LOOKS LIKE FINISHED
TRANSMISSION CROSSMEMBER FABRICATION ( ONE THING LEADS TO ANOTHER.)
DASH PANEL FABRICATION FOR SWITCHES
DASH BOARD SWITCH PANEL
ALTERNATOR MOUNT FABRICATION
AIR INLET MOUNT FABRICATION
BLOWOFF VALVE HAD TO BE FABRICATED INTO THE SYSTEM
THIS IS WHAT THE FINISHED ENGINE COMPARTMENT LOOKS LIKE AFTER ALL THE MODS
|
Return Home
|
About Us
|
Our Services
|
Shop Work
|
Engine Builds
|
Whats New
|
On-line Catalog
|
Close-outs and Used Items
|
Vendor Lines
|
Contact Us
|
Copyright © 2008, BIER BROTHER'S PERFORMANCE. All rights reserved.